Chapt 9 MIXING¡ªGENERAL DISCUSSION AND THEORY
Introduction
Rapid Mixing
Rapid Mixing Vessel Considerations
Flucculation Mixing/Agitation
Chapt 10 TREATABILITY TESTING
Introduction
Determination of Optimum pH Level
Determination of Coagulant and Coagulant Aid Dosage Rates
Determination of Settling Rates
Determination of Sludge Characteristics
Oxidation Considerations (Iron and Manganese Removal)
Chapt 11 PRE-TREATMENT REQUIREMENTS
Introduction
Flow Equalization
Oil and Grease Removal
Chromium Reduction
Cyanide Destruction
Complexing/Chelating Agent Removal
Chapt 12 EQUIPMENT REQUIREMENTS
Introduction
Equalization Tank/System
pH Control System
Tank/Reactors
Rapid Mixers
Flocculators/Agitators
Chemical Feed Equipment
Sludge Dewatering Equipment
Miscellaneous Equipment
Chapt 13 P/C/F SYSTEM COSTS, STARTUP, AND OPERATIONS
Introduction
System Costs
Pre-Startup Checkouts
Pre-Startup Testing
Startup
Field Training
Shutdown
Operation and Maintenance Manual Updates