2!Selected Case Histories -Navigation, Flood Control, and Dam Structures -Bridges -Immersed Tube Tunnels and Pipelines Bay Area Rapid Transit (BART) Tunnel Boston Tunnel Chek Lap Kok Airport transportation links Oresund Link Puget Sound gas pipeline North Sea gas pipeline Los Angeles sewage sludge outfall Puerto Rico sewage outfall - Offshore Oil Platform Structures Jacket and jack-up structures Compliant tower structures Tension-leg platform structures Gravity-based structures - Other Underwater-Founded Structures Wharf off-loading system Ship dry docks Berlin¨s Potsdamer Platz Baltic Sea wind turbines Offshore military tracking platforms Bantry Bay tanker terminal Submerged oil storage tank
5!Foundation Preparation and Construction - Quality Control and Quality Assurance Issues Preconstruction phase Construction phase Acceptance phase Postconstruction monitoring phase - Foundation Installation and Testing Improved-site foundations Gravity-based foundations Pinned foundations Foundation-structure connections - Underwater Foundation Testing Small strain integrity testing Large-strain testing Load testing - Long-Term Considerations Deleterious effects Foundation behavior monitoring 6!Summary and Conclusions
3!Foundation Site Assessment - Site and Foundation Selection Process - Site Assessment and Characterization Preliminary assessment Hydrographic surveying and environmental data collection Geophysical investigations - Soil and Rock Engineering Properties In situ methods Drilling and sampling Laboratory testing
4!Design Considerations - Foundation Types Improved-site foundations Gravity-based foundations Pinned foundations - Foundation Selection Criteria and Design Issues Selection criteria Design considerations Analysis and verification testing - Quality Control and Assurance Issues Engineering design phase Specifications and contract document phase Recent Corps of Engineers underwater foundation contracts